Index · 2026

Projects.

A working register of every site MNG holds — under design, mobilizing, in delivery, or recently handed over. Updated weekly from Tashkent.

All · 06Heavy StructuresEnergyIndustrialCivilIn deliveryMobilizing
001

Site Alpha

Navoi Region · Industrial

A long-span enclosure built to host high-tolerance industrial process work, with foundation engineering tuned to the regional seismic profile.

Scope · Design · Build Schedule · 14 months Live
002

Site Beta

Kashkadarya · Energy

Civil and structural works for a utility-scale generation campus, including substation pad, racking foundations, and full balance-of-plant.

Scope · EPC civil · BoP Schedule · 18 months Live
003

Site Gamma

Tashkent · Civil

Earthworks, hardstands, and primary access works for a mixed-use industrial precinct on the eastern edge of the capital region.

Scope · Civil package Schedule · 9 months Mobilizing
004

Site Delta

Samarkand · Industrial

Production-grade enclosure with embedded process foundations, designed for 24/7 operation and a thirty-year service horizon.

Scope · Turnkey Schedule · 16 months Design
005

Site Epsilon

Bukhara · Energy

Greenfield civil works and grid-connect package for a regional generation site, delivered on a fixed-date interconnection window.

Scope · EPC civil Schedule · 12 months Tender
006

Site Zeta

Fergana Valley · Heavy Structures

Reinforced concrete superstructure with long-span steel members, engineered for heavy point loads and continuous operation.

Scope · Design · Build Schedule · 22 months Concept
From the field

Site footage.

Auto-published from R2 · /sites/2026

Working with MNG

Bring us in early — pre-design is where schedule is won or lost.